16.11.2020

In Brest, the heating capacity of the local boiler house was increased – a new electric boiler was installed. The modernization will provide heat to 175 houses, 10 kindergartens, four schools and a lyceum. The energy for the production of heat from the new equipment will mainly be used at night. The program of measures to integrate BelNPP into the country's energy system provides for the commissioning of 20 such electric boilers. This will help to provide heat to large settlements and save energy resources.

Share:

Вверх