26.01.2017
The construction of the engineering and transport infrastructure for the starting zone of the Chinese-Belarusian industrial park Great Stone has been completed. Roads as well as gas, electricity, and domestic water supply networks have been already commissioned. The infrastructure corresponds with the engineering systems of a town with a 50,000-strong population. The park will be able to accommodate investors on the territory of 350 hectares.
Share:

Вверх