The Belarusian NPP will operate in full capacity in the second half of 2022. Alexander Lukashenko adopted the terms of putting two energy units into operation. The first one has already been switched into the country's energy system since early November and reached 40% of its designed power. It is planned to be put into the trial industrial use next year. The total power of the Belarusian NPP is 2400 Mwt. With the station's launch, about a third of the country's internal electricity demand will be covered.